DPWH
rehabilitated roads along Pilar Road
By
GISSELLE G. PARUNGAO
July 12, 2019
CALBAYOG CITY – The
roads from barangays Oquendo to Bayo which is also known as the
Pilar Road are rehabilitated and improved by the Department of
Public Works and Highways (DPWH).
These ten (10) projects
under the Local Infrastructure Program is appropriated with a total
of P200 million. The road covered by the projects has a total net
length of 18.351 lane kilometres.
The existing road is
already damaged and uneven which is unsafe for the motorists and
vehicles going to and from Calbayog City via that road. This is
beneficial to the farmers living in that area since the roads are
now even and widened from 4 meters to 6 meters. They can now
transport their produce without the hustle of a rough road which
creates danger to someone’s safety.
DPWH is not only creating
roads but also maintaining their statuesque form as well as keeping
up with the changes around it like widening of roads (primary and
secondary).