P289M mitigation 
			structures to ease flood problems in Leyte
			
			By 
			DPWH 2nd LED
			June 28, 2019
			CARIGARA, Leyte – 
			To strengthen infrastructure for flood risk mitigation, the 
			Department of Public Works and Highways Leyte Second District 
			Engineering Office has commenced the construction of P289.74 million 
			flood mitigation structure projects.
			District Engineer Gerald 
			Pacanan said that there are already 4 ongoing projects which include 
			construction Can-isak Riverbank in the town of Barugo worth P15 
			million, construction of flood control structure along Manloy River 
			in Carigara worth P20 million, and construction of Luan Seawall in 
			Dulag, Leyte worth P17 million and construction of Daguitan-Marabong 
			River flood control in Brgy. Batug, Dulag, Leyte worth P42.47 
			million.
			“This is a priority 
			project of the government as it aims to provide solution to the 
			frequent flooding and protect the residents and properties in these 
			low-lying areas of the district,” added Pacanan.
			On top of these projects, 
			the office will also undertake eight construction/ rehabilitation of 
			flood mitigation structures and drainage systems within the 
			district.
			Among these projects are 
			the P84 million in Binahaan river K001+540 - K002+255 and K002+255 - 
			K002+880 in Pastrana, Leyte; P30 million Carigara River in Sitio 
			Bariis of East Visoria to Brgy. Canal and P20 million in East 
			Visoria all in Carigara, Leyte; P7.5 million Poblacion Zone 2 
			seawall, P10 million Balud seawall, and P10 million Domiri river in 
			Brgy. Culasian all in Capoocan, Leyte, and the P30 million Himanglos 
			river in Brgy. Santarin to Brgy. Hilaba in Barugo, Leyte.
			The district engineering 
			office targets to start construction of all flood mitigation 
			projects before the rainy season and complete them within its 
			calendar days.